Hotel Expansion in Las Vegas

Our Kalb Industries team is getting ready to start construction on a 24 room 3-story addition at a local hotel on West Sahara.  We are gearing up to start demolition to clear the way for the new building pad.

Once the building pad is ready our subcontractors will start on framing.  Our scope of work also includes drywall, new tile roof system, lightweight concrete between floors for sound control, exterior stucco, aluminum windows, cabinets and granite countertops, entry and interior doors, grid ceilings at corridors, paint, carpet and tile, tub/shower with cultured marble panels, bathroom accessories, signage at rooms and corridors, new fire sprinkler system, plumbing, heating, ventilation and air conditioning system, fire alarm system, and complete electrical system.

To finish out around the expansion, we will be adding new landscaping, new concrete for entryway, sidewalks, footings and building slab, alterations to the trash enclosure, and  additional ornamental iron fencing.  The hotel will stay open during the five months of construction.  Keep an eye on our progress.